Quick! Load another kiln before the stuff buries us! We need to expand. Yes we do.
The Adventures of a Pottery family living on the edge of the Allegheny National Forest in Tionesta, PA We appreciate comments and conversation, so please don't be shy!
Total Pageviews
Tuesday, January 17, 2012
Feeling a little overwhelmed by piles of work
Quick! Load another kiln before the stuff buries us! We need to expand. Yes we do.
Tuesday, January 10, 2012
A good start
Today was my first real day of work this year. Not that I haven't been working, but I went into the studio to make more pieces. At the end of last year, I posted we had made some decisions to change a few things about how we run the daily business. The basic plan was more focused work, starting in the AM and cutting off before we're so tired we can't think. Making sure we leave plenty of time for recharging, dates, making whoopie and other fun hobbies.
The plan was to be up by 8 and to the studio by 9. The plan for today was to make 75 items, perhaps 100, pack some things deliver them to the post office and have some ware boards cut. I can report partial success.
I was up by 9 and to the studio by 11:30.
I made 71 pieces
The new ware boards are in use :) The old ones held two rows of Tankards, that's 40lbs of clay on a 10lb board and I always put them up on the top shelf (like in this picture) The new ones are on the bottom left. hold 1/2 as much, but are much easier to move around. I am pleased, and there are enough I won't run out of ware boards until after my shelves are overflowing with pieces.
Tomorrow I'm going to aim for up by 8 and into the studio by 9 again. The pieces under the plastic are practically ready to trim now. If I hadn't covered them the rims would already be bone dry. Not bad for throwing them between 11:30 and 2PM.
The plan was to be up by 8 and to the studio by 9. The plan for today was to make 75 items, perhaps 100, pack some things deliver them to the post office and have some ware boards cut. I can report partial success.
I was up by 9 and to the studio by 11:30.
I made 71 pieces
The new ware boards are in use :) The old ones held two rows of Tankards, that's 40lbs of clay on a 10lb board and I always put them up on the top shelf (like in this picture) The new ones are on the bottom left. hold 1/2 as much, but are much easier to move around. I am pleased, and there are enough I won't run out of ware boards until after my shelves are overflowing with pieces.
Tomorrow I'm going to aim for up by 8 and into the studio by 9 again. The pieces under the plastic are practically ready to trim now. If I hadn't covered them the rims would already be bone dry. Not bad for throwing them between 11:30 and 2PM.
Friday, December 30, 2011
The Big List, NOT a bucket list.
A bucket list implies "before you die." I want this stuff to start happening now.
Along with the yearly review of things business which I covered in the previous posting. I have a list of other things I want to be able to do. Some of them have been waiting for a long time. I don't know how I am going to accomplish them, but I want them done..and with the house and studio oriented tasks the sooner the better.
There has to be a way right?
House and Studio:
My first and most important wish is to get the studio out of our basement and into an outbuilding. The trouble is we don't have an outbuilding. So we'd have to build one. Our dream building will have about double the space we currently have in the basement. many windows, at least one garage door and a small area for retail. We found the perfect building while at the local Grange Fair. a two car garage with a little extra room for about $13,000 delivered. It was huge and could be insulated, wired for electricity and the space divided. Unfortunately we also would need to excavate, pour a concrete pad. Get running water and have some sort of drain system..though I think a floor drain would work for us. I estimate the final cost at around $30,000. This, in case you wondered, is about 2400 mugs at wholesale prices.*sigh*
The most important home repairs we need all take place in the old section of our basement. The first is we have a massive crack in our foundation which is where our basement flooding problem comes from. I don't have any ideas on this one. I guess we need to have someone come and look at it. When it pours it actually looks like a little waterfall. Fortunately there is a floor drain for small rainstorms, but when we have 4 or 5 day monsoons we have to head downstairs with a sump pump and a shop vac. It gets old really fast. Truly it is also dangerous because it has come within inches of a 2000 degree kiln. if water seeped into the hot kiln I think it would be like a boiler explosion. The house would just be gone and parts of us scattered over Port Matilda PA. If the kilns were in a new outbuilding I could tolerate a little flooding.
Next is a water softener. The water in our house is so hard we've had to replace two kitchen faucets since we moved here 4 years ago.The water to our bathroom sink is at a trickle and we regularly soak our shower head in CLR to keep it flowing. This is driving me crazy.
The next thing is we need to rearrange the floor plan of the house. Some of the folks who have been to our house know where we're coming from. We have some ideas, but need to consult someone as to the actual possibilities. I think there are walls to be moved. Some of it I know we could do ourselves, but some of it is way out of our expertise.
Once this list is kicked, there will be celebrating to do, and the thing we want to do more than anything is travel. On the list of places to go:
All of our National Parks,
I'd prefer to do most of it on the road. A pickup and an RV. However this will require 2 things we don't have. One is an RV, the other is the several weeks a year to take off across the country. I suppose if my house list gets accomplished we'll be able to work out the time and the RV because we'll be on a roll of amazing things happening.
Then of course we'd like to head back to Ireland. We're just not done with that lovely country yet. Then Scotland and Wales.
Rowan would like to get back to Greece, and then of course Turkey is right next door, and we have friends who have offered us lodging there.
Life is short and we work too much. How can we make this happen?
.
Along with the yearly review of things business which I covered in the previous posting. I have a list of other things I want to be able to do. Some of them have been waiting for a long time. I don't know how I am going to accomplish them, but I want them done..and with the house and studio oriented tasks the sooner the better.
There has to be a way right?
House and Studio:
My first and most important wish is to get the studio out of our basement and into an outbuilding. The trouble is we don't have an outbuilding. So we'd have to build one. Our dream building will have about double the space we currently have in the basement. many windows, at least one garage door and a small area for retail. We found the perfect building while at the local Grange Fair. a two car garage with a little extra room for about $13,000 delivered. It was huge and could be insulated, wired for electricity and the space divided. Unfortunately we also would need to excavate, pour a concrete pad. Get running water and have some sort of drain system..though I think a floor drain would work for us. I estimate the final cost at around $30,000. This, in case you wondered, is about 2400 mugs at wholesale prices.*sigh*
The most important home repairs we need all take place in the old section of our basement. The first is we have a massive crack in our foundation which is where our basement flooding problem comes from. I don't have any ideas on this one. I guess we need to have someone come and look at it. When it pours it actually looks like a little waterfall. Fortunately there is a floor drain for small rainstorms, but when we have 4 or 5 day monsoons we have to head downstairs with a sump pump and a shop vac. It gets old really fast. Truly it is also dangerous because it has come within inches of a 2000 degree kiln. if water seeped into the hot kiln I think it would be like a boiler explosion. The house would just be gone and parts of us scattered over Port Matilda PA. If the kilns were in a new outbuilding I could tolerate a little flooding.
Next is a water softener. The water in our house is so hard we've had to replace two kitchen faucets since we moved here 4 years ago.The water to our bathroom sink is at a trickle and we regularly soak our shower head in CLR to keep it flowing. This is driving me crazy.
The next thing is we need to rearrange the floor plan of the house. Some of the folks who have been to our house know where we're coming from. We have some ideas, but need to consult someone as to the actual possibilities. I think there are walls to be moved. Some of it I know we could do ourselves, but some of it is way out of our expertise.
Once this list is kicked, there will be celebrating to do, and the thing we want to do more than anything is travel. On the list of places to go:
All of our National Parks,
I'd prefer to do most of it on the road. A pickup and an RV. However this will require 2 things we don't have. One is an RV, the other is the several weeks a year to take off across the country. I suppose if my house list gets accomplished we'll be able to work out the time and the RV because we'll be on a roll of amazing things happening.
Then of course we'd like to head back to Ireland. We're just not done with that lovely country yet. Then Scotland and Wales.
Rowan would like to get back to Greece, and then of course Turkey is right next door, and we have friends who have offered us lodging there.
Life is short and we work too much. How can we make this happen?
.
Subscribe to:
Posts (Atom)